Taiwan Taoyuan International Airport Terminal 3
[edit] Overview
In November 2015, it was announced that architects Rogers Stirk Harbour + Partners (RSHP) and Taiwan engineering firm CECI had won the competition to design a new Terminal 3 at Taiwan Taoyuan International Airport.
Formerly known as Chiang Kai-shek International, the airport is the largest in Taiwan and the eleventh busiest in the world. The new project will include; a terminal building, boarding gates, concourses, a multi-function building and transport infrastructure. Upon completion, the new terminal will be able to accommodate 45 million passengers a year.
The project builds on RSHP’s previous major airport experience, bringing together the flexibility of the single-span, loose-fit volume of Heathrow Terminal 5 with the flowing interior spaces of Barajas Terminal 4. It is inspired by Taiwan’s beautiful landscapes and seas, its rhythms of nature and life to create a series of unique interior places beneath an elegant hard shell roof.
The result is a unique and fluid architecture that allows for easy adaption without compromising the passenger experience or the architectural integrity. The dynamic interior celebrates the nature of the ever-changing spaces below; whether grand, intimate, uniform or dramatic.
The terminal building will be the first of a new generation, offering arriving passengers a similar spatial experience to those departing. Its rational plan arrangement is forecast to deliver minimum connection times of just 40 minutes, with simple way-finding and airside connectivity.
Ivan Harbour, Partner at RSHP said “Our proposal is focussed on a passenger’s experience with a deliberate strategy to absorb constant future change, whilst always retaining the integrity of its unique design. The terminal will be designed to meet the highest sustainability criteria; holistic engineering and architecture.
“We have created a rationally planned and easy to use airport that will be characterised by a flowing sequence of beautifully lit, acoustically comfortable and well-proportioned spaces. It will be an airport where the drama of the spatial experience is shared by all, at all times. The approach to the airport and the open spaces within it will have an urban quality akin to a city centre. Addressing these spaces there will be a variety of buildings that, together with the new and existing terminals, will form the heart of a new compact, vibrant ‘aero’ city.”
--RSHP
[edit] Related articles on Desinging Buildings Wiki
- Airports.
- CIBSE Case Study: Christchurch International Airport.
- Gatwick second runway.
- Heathrow Terminal 5.
- Hong Kong Boundary Crossing.
- London City Airport expansion.
- McArthurGlen Designer Outlet Ashford.
- One Park Taipei.
- Madrid Barajas Airport.
- Procurement of Heathrow T5.
- Thames estuary hub airport.
Featured articles and news
How can digital twins boost profitability within construction?
A brief description of a smart construction dashboard, collecting as-built data, as a s site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.